About the project
A reinforced-concrete frame for a multi-storey commercial development, delivered as a subcontract to the main contractor. The scope covers raft foundations, columns, beams and suspended slabs, with formwork, reinforcement and pouring by Ablaj crews.
Pours are scheduled for the cooler hours and the mix was designed with retarders and supplementary cementitious materials for hot-weather concreting. Slump and cube test results are logged for every structural pour and handed over with the as-built records.
- Raft foundations and ground beams
- Columns, beams and suspended slabs
- Hot-weather mix design and curing regime
- Documented strength testing to SBC and SASO standards